Mining & survey
Equip the crew, record the ground.
Estimate mining supply from your own base rate and equipment, then keep a local notebook of deposits, rates and locations to feed factory plans.
Mining equipment estimator
| Equipment | Client multiplier | Available on parcel |
|---|---|---|
| Mining Barrow | 1.5× | |
| Skid-Steer Loader | 2× | |
| Drill Rig | 3× | |
| Mining Excavator | 5× | |
| Haul Truck | 7× | |
| Bucket-Wheel Excavator | 10× |
Estimated supply: 1 Iron Ore/min. 0 miners have a vehicle; 1 use the base rate.
Create or select a factory to add this estimate as an external supply.
Survey notebook
0 savedRecord deposits you have surveyed. Data stays in this browser and can be exported as JSON. Survey equipment effects are not predicted; keep the gear name as a note.
No deposits saved yet.
Resource workflow
From land to factory supplies
Check each part of the supply chain before relying on an estimate.
- Check your land
Confirm ownership and survey information in game before staking a zone.
- Prepare your crew
Check miners, available vehicles and yard storage. Resources depend on location.
- Measure the output
Use the actual resource rate to update your factory's external supply.
- Connect the supply chain
Check logistics before relying on network surplus.
Changelog & data updates. Data was checked against a current version of the game. This is not a live-game measurement. Verify current equipment details in game after updates. The mining Haul Truck and hauling Box Truck are distinct equipment.