Planner

Balance whole machines.

Set the output you need. The planner rounds whole machines and carries their full-speed ingredient demand upstream, combining shared inputs before rounding.

Requested / min1
Installed output / min1.2
Machines required19
External inputs3

A-Frame Sign production chain

Crafting quantities →

Capacity assumes every assigned machine runs at full speed with all supplies available. Required machines are separate from owned inventory. External inputs still need to be sourced.

ItemNeeded / minNetworkTo produceCapacity / minExtra / minMachineCountRecipe
A-Frame Sign 1011.20.2Carpentry Bench4Build an A-frame sign
Nails 9.609.6166.4Manufacturing Press2Press nails
Planks 14.4014.4161.6Sawmill5Saw planks
Plastic Sheet 1.201.21.60.4Manufacturing Press2Extrude plastic sheet
Iron Bar 0.800.810.2Furnace2Smelt iron bars
Lumber external404————External supply
Plastic Pellets 4046.42.4Chemical Plant2Polymerise pellets
Iron Ore external202————External supply
Naphtha 1.601.62.40.8Oil Refinery2Crack naphtha
Crude Oil external303————External supply

Heat, cooling & power

Cooling planner →

Machines give off heat and draw power. Enter the room latitude and area to estimate the temperature, slowdown, air conditioners and electricity cost of the assigned machines.

Machine heat1,4505 heat sources
Room temperature39.23 °CHot
Production speed75%−25% from heat
Machines draw93 kW

This room runs at 39.23 °C and needs 1 industrial AC(s) to cool (≈ 15 kW). Total draw including cooling is 108 kW, about $8.748/min at the entered price. Compare power draws or open the cooling planner.

MachineCountHeatDraw (kW)
Carpentry Bench41206
Manufacturing Press436016
Sawmill530020
Furnace245015
Chemical Plant222012
Oil Refinery2024

Heat, temperature and slowdown follow the client model. Cooling assumes industrial AC units (1500 heat removed each). Power uses the client's kWh conversion; verify in game after an update.

Saved plans

0

No saved plans yet. Try a starter blueprint.

Supply & logistics

The chain above is nominal capacity. Source the external inputs and move them with the resource tools.

Add to combined shopping list

Plan this product together with others and gather each raw material once.

Open full shopping list

Products to craft

ProductQuantity

Add at least one product with a positive quantity.

Opening locally saved factory data…